期刊文献+

基于数据挖掘技术的项目风险管理研究 被引量:1

下载PDF
导出
摘要 建设工程项目的风险管理贯穿在项目的全生命周期中;由于能够影响建设工程项目的进度、目标、质量、效益、人力、天气等一系列不确定因素,使得在建设项目中会带有一定的风险和不确定性。基于目前的项目风险管理现状,大力发展数据库和数据挖掘技术在此方面的应用,将为项目风险管理带来极大的便利。根据目前的数据挖掘技术,深入了解该技术的原理和使用方法,说明其在项目风险管理中的应用和意义,进一步深化研究数据挖掘在项目风险管理中的应用研究提供了参考。 The construction project risk management embodied in the entire life cycle of the project;due to the impact of the construction project schedule, objectives,quality and efficiency, manpower, weather and a series of uncertain factors,so in the construction project with a certain risk and uncertainty.Based on the current situation of project risk management,the development of database and data mining technology in this area will bring great convenience to project risk management. According to the current data mining technology, in-depth understanding of the principle of the technology and the use of methods to illustrate its application and significance in project risk management,provide reference for the application of risk management in the project to further deepen the research on data mining.
作者 王欢
出处 《信息记录材料》 2017年第5期94-96,共3页 Information Recording Materials
关键词 数据库 数据挖掘 数据分析 风险管理 项目管理 Database Data mining Data analysis Risk management Project management
  • 相关文献

参考文献3

二级参考文献28

  • 1[1]Inmon W H. The data warehouse and data mining[J]. Communication of the ACM, 1996,39(11):.
  • 2[2]Fayyad U, Piatetsky-Shapiro G, Smyth P. The KDD process for extracting useful knowledge from volumes of data[J]. Communications of the ACM,1996,39(11):27-35.
  • 3[3]Agrawal R,Mannila H,Srikant Retal. Fast discovery of association rules. Fayyad M,Piatetsky-Shapiro G, Smyth P eds. Advances in Knowledge Discovery and Data Mining[M]. MenloPark, CA:AAAI /MIT Press, 1999.307-328.
  • 4[4]Inmon W H, Hackathorm R. Using the ware house[M]. JohnWiley&Sons,1998.50-150.
  • 5[5]Srikant R,Agrawal R.Mining generalized association rules[A]. Dayal U, Gray PMD, Nishio S eds. Proceedings of the International Conferenceon Very Large Data-bases[C]. San Francisco, CA:Morgan Kanfmann Press,1998.406-419.
  • 6[6]Adriaans P, Zantinge D. Data mining[M]. London:Addison Wesley Longman, 1999.40-100.
  • 7台涪国际电子商务中心.国际企业及市场之实际风险管理[EB/OL].http://www.org.tw/cnt/,2003.
  • 8乌尔里希·贝克.自由与资本主义[M].杭州:浙江人民出版社,2001.119-120.
  • 9Kuchta, Dorotaa. Use of fuzzy numbers in project risk (criticality) assessment [J]. International Journal of Project Management, 2001,19(5) : 305-310.
  • 10Dale Hattis, David E Burmaster. Assessment of variability and uncertainty distributions for practical risk analysis [J].Risk Analysis, 1994, 14(5): 713-730.

共引文献148

同被引文献5

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部