摘要 针对桥面宽度37.6m的某高速公路斜拉桥,设计了一套超宽、适用的前支点挂篮,运用大型通用有限元软件对挂篮施工进行了模拟计算,对挂篮各部位进行了安全验算分析,经分析,挂篮各部位满足各个施工工序的受力要求,有效指导了施工。 A set of wide and available front support point construction cradle is designed according to the highway cable - stayed bridge with 37. 6m extra - wide beam, the simulation calculation of construction are conducted by used the large - scale common finite element software, The structural security analysis of the different parts of the cradle was carried out. Through analysis, the different parts of the cradle meet the stress requirements of each construction process, and effectively guide the construction.
作者 杨相展
出处 《北方交通》 2017年第6期42-44,48,共4页 Northern Communications
关键词 斜拉桥 超宽桥面 前支点挂篮 模拟计算 Cable- stayed bridge Extra- wide beam Front support point construction cradle Simulation calculation
  • 相关文献

同被引文献10

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部