摘要
介绍了某钢厂工程的PHC桩锤击沉桩施工过程中所遇到的一系列典型案例,对其进行分析并提出解决的方案。这些案例中遇到的均为锤击沉桩施工中的常见问题,具有较强的代表性和参考价值。
This thesis introduces a series of typical cases encountered an engineering PHC piling in the construction process, analyze and propose solutions. Encountered in these cases are common problems in the construction of piling, which has strong representativeness and reference value.
出处
《工程建设与设计》
2017年第11期168-170,173,共4页
Construction & Design for Engineering