结合二矿综放工作面的设备运输要求,对运输系统进行了总结分析,同时也对运输设备的能力进行了计算。通过有效的运输管理手段,圆满完成了综采设备的运输任务,为矿井创造了良好安全和经济效益。
Combined with the caving working face transport equipment requirements, the transportation system was analyzed, and the transportation equipment capacity is calculated by effective means of transportation management, the successful completion of the fully mechanized mining equipment transport task to create a good safety and economic benefit for the mine.
出处
《机械管理开发》
2017年第6期39-40,58,共3页
Mechanical Management and Development
关键词
工作面安装
运输设计
探讨
working face installation
transportation design
discussion