摘要
根据山西中部电网龙城500 kV变电站220 kV线路的投产时序,对其近区主要变电站的短路电流和潮流状况进行了深入探讨,分析了龙城变电站接续完善后各变电站短路电流和潮流的变化趋势,以保证山西电网安全稳定地运行。
According to the production sequencing of 220 kV line of Longcheng 500 kV substation in Shanxi central power grid, the short circuit current and the flow current situation of the main substation in the near area are deeply discussed and analyzed so as to ensure the safe and stable operation of Shanxi power grid.