根据采油厂注水站项目建设的实际情况,筛选出建设后经济评价的不同要素,结合模糊层次分析法的方法和思路,计算出综合评价结果,为注水开发宏观调控提供指导。
According to the actual situation of the project construction of the oil injection plant,the different elements of the economic evaluation after construction are selected,and the method of fuzzy AHP is used to calculate the comprehensive evaluation results and provide guidance for the control of water injection development.
出处
《石化技术》
CAS
2017年第6期32-32,共1页
Petrochemical Industry Technology
关键词
经济评价
工程项目
注水站
延长油田
economic evaluation
project
water injection station
Yanchang Oilfield