摘要
介绍生活垃圾焚烧发电项目开展环境监理工作的必要性,从设计、施工、试生产三个阶段分别介绍生活垃圾焚烧发电项目环境监理相关内容,针对垃圾发电项目特点,提出三个监理阶段重点及注意事项。
This paper introduces the necessity to carry out the work of environmental supervision, garbage incineration power generation project from design, construction, commissioning three stages respectively introduce garbage incineration power generation project related contents of environmental supervision, according to the characteristics of garbage power generation project, put forward the three stage of heavy supervision point and the matters needing attention.
出处
《中国资源综合利用》
2017年第5期67-68,71,共3页
China Resources Comprehensive Utilization
关键词
生活垃圾焚烧发电
环境监理
废气、渗滤液
关键工程
municipal solid waste incineration power generation
environmental supervision
waste gas
leachate
key engineering emphasis