5Sturk R, Olsson L, Johansson J. Risk and decision analysis forlarge underground projects as applied to the Stockholm ring roadTunnels [J] . Tunnelling and Underground Space Technology,1996,11 (2) : 157 -164.
6Nilsen B, Palmstr M A,Stille H. Quality control of a subsea tunnelproject in complex ground conditions [ C] , Challenges for the 21stCentury. Proceedings of World Tunnel Congress 99. Oslo:A. A. Balkema,1999.
7Duddeck H. Challenges to tunnelling engineers [ J ] . Tunnellingand Underground Space Technology, 1996, 11 ( 1) : 5-10.
8Eskesen S D,Tengborg P, Kampmann J, et al. Guidelines for tun-nelling risk management : international tunnelling association,working group No. 2 [ J ] . Tunnelling and Underground SpaceTechnology, 2004, 19 (3) : 217 -237.
9Odgard A,Bridges D G. Design and risk analyses for the great belteast tunnel [ J ] . Structural Engineering International, 1995, 5(4): 216-217.