摘要 某热电厂热网一、二期一次网水系统独立运行,热网一、二期回水管路设有联络阀门,供水管路也在多处设有联络门。为实现热网一、二期9台热网循环泵互相备用,解决热网二期单台热网加热器超流量运行问题,最大限度发挥热泵与电蓄热装置的性能优势,进行了一、二期一次网水系统环并运行试验。试验数据分析结果显示,有效提高了供热的可靠性、灵活性与经济性。 For the heating network of a certain thermal power plant,the primary network water systems of the first and second stages are operating independently. Between the return lines of the first and second stages,connecting valves are equipped. Besides that,some connecting doors are also equipped for water supply lines in multiple places. In order to realize the mutual standby among the 9 circulating pumps of the first and second heating network stages,solve the ultra-flow operation problem of single heater of the second stage and maximize the performances of heat pump and electric heat storage device,this paper conducted a primary network water systems combination operation test between the first and second stages. The analysis result of the test data shows that it effectively improves the reliability,flexibility and economics of the heat supply.
作者 许冰 宋宏飞
出处 《华电技术》 CAS 2017年第6期47-50,共4页 HUADIAN TECHNOLOGY
关键词 热电厂 热网 一次网水系统 环并 热泵 电蓄热装置 热网循环泵 thermal power plant heating network primary network water system combination heat pump electric heat storage device circulating pump in heating network
  • 相关文献

参考文献2

二级参考文献4

  • 1段洁仪.多热源热水供热网优化设计研究:硕士学位论文[M].北京:清华大学热能工程系,1989..
  • 2E.Я.索柯洛夫.热化与热力网[M].北京:机械工业出版社.1988.
  • 3秦绪忠.江亿.集中供热系统的可及性分析.暖通空调.2000年.
  • 4秦绪忠,江亿.集中供热网的可及性分析[J].暖通空调,1999,29(1):2-7. 被引量:36

共引文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部