海外EPC路桥项目的设计管理 被引量:2

Design Management of Overseas EPC Road and Bridge Project
下载PDF
导出
摘要 EPC项目模式,即集设计、采购、施工于一体,承包了设计、采购、施工三个阶段于一体的工程总模式。随着我国"一带一路"政策方针的大力执行以及大力推广"走出去"发展战略,积极的筹划运行道路交通项目,港口项目,房建项目工业园区项目,铁路项目以及房建项目桥梁项目等多种项目,很多的EPC项目都在国外呈现出了欣欣向荣的发展状况。以兰州新区综合保税区第五标段(巡关道)项目为例,详细介绍EPC项目管理模式中"工可"设计、施工图设计以及责任期设计三个管理阶段。 EPC project model, that is, set design, procurement, construction in one, contracted design, procurement, construction in three phases of the overall project model.With the vigorous implementation of China's "The Belt and Road" policy, vigorously promote the "going out" strategy, planning the operation of road traffic project, active port project, the construction project of industrial park projects, railway projects and the construction project of bridge project and other projects, many of the EPC project in foreign countries are developing the thriving of. In this paper, the Lanzhou new area integrated free trade zone fifth section (Xun Guandao) project as an example, introduced in detail the EPC project management model can design, construction drawing design and the responsibility of the design of the three stages of management.
作者 李金成
出处 《建筑技术开发》 2017年第6期63-64,共2页 Building Technology Development
关键词 EPC路桥项目 设计管理 施工设计 项目管理 EPC road and bridge project design management construction design project management
  • 相关文献

参考文献1

二级参考文献5

共引文献35

同被引文献9

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部