工程在桥梁具体施工中,对既有设备资源优化再造,能使既有大型移动模架设备适应不同桥梁项目的施工。移动模架采用墩顶吊架及同步液压千斤顶整体吊装,提高了移动模架安装精度、安全、质量和功效。研究低碳环保的施工技术,是降低成本和提升效益重要途径。
Engineering in the specific construction of the bridge, the existing equipment optimization and recycling resources, can make both large mobile equipment to adapt to different bridge project construction. Integral hoisting of pier top hanger and synchronous hydraulic jack with mobile mould, improve mobile formwork installation accuracy, safety, quality and efficacy. It is an important way to reduce the cost and improve the benefit to study the construction technology of low carbon environmental protection.
出处
《建筑技术开发》
2017年第6期85-86,共2页
Building Technology Development