期刊文献+

大型相控阵雷达天线阵面备件优化配置研究 被引量:1

Research on Optimization Model for Spare Parts of Large-Scale Phased Array Radar Antenna
下载PDF
导出
摘要 针对大型相控阵雷达天线阵面视情维修与定期维修在维修时机上存在交叉的现象,将视情维修与定期维修相结合,提出了一种基于m/T维修策略大型相控阵雷达天线阵面备件优化配置模型。首先,在对m/T维修策略分析的基础上,建立了系统的使用可用度模型,并利用0-1分布对使用可用度进行了求解计算;然后,以使用可用度为约束条件,以LRU备件配置费用最小为优化目标,对大型相控阵雷达天线阵面备件配置进行了优化研究;最后,通过实例验证了该优化模型的有效性。 Aiming at the problem of time overlapping between condition-based maintenance and periodic maintenance of large phased array antenna, the m/T maintenance policy is put forward. Based on this maintenance policy, a system optimization model for spare parts is established. Firstly; a system operational availability model is set through analyzing the m/T maintenance policy; and the operational availability is calculated using 0-1 distribution law. Then, the optimization of spare-part configuration is studied by taking the operational availability as constraint condition and the configuration cost of LRU spare parts as optimization objective. Finally, the validity of the proposed maintenance and optimization model is verified by an example.
作者 常春贺 武高卫 于兴伟 姚旭 CHANG Chunhe WU Gaowei YU Xingwei YAO Xu(Huangpi Sergeant School, Air Force Early Warning Academy, Wuhan 430345, China Department of Graduate Mangement, Air Force Early Warning Academy, Wuhan 430019, China Unit 95921 of PLA, Jinan 250000, China North Theater Air Force Staff, Shenyang 110015, China)
出处 《雷达科学与技术》 北大核心 2017年第3期334-338,共5页 Radar Science and Technology
基金 校预研基金项目(No.XK2016Y001)
关键词 天线阵面 k/N系统 维修策略 使用可用度 备件 array antenna k/N system maintenance policy operational availability spare parts
  • 相关文献

参考文献7

二级参考文献62

共引文献47

同被引文献8

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部