摘要
以杭州市一深基坑工程为背景,采用ABAQUS有限元软件建立三维数值模型,分析隔离桩半径对既有地铁隧道位移的影响。研究结果表明:基坑开挖最终引起了隧道衬砌竖向位移约4 mm,水平位移约1 mm,与实测值相吻合;隧道衬砌位移最大值位于衬砌拱底,最小值位于衬砌拱顶,衬砌变形整体呈沉降的趋势;靠近基坑一侧隧道衬砌总位移比另一侧略大;隔离桩的半径越大,基坑开挖对既有地铁隧道的影响越小。
The excavation of a deep foundation pit in Hangzhou is the engineering background. A three-dimensional numerical model is established using ABAQUS,a finite element software. The influence ofisolation pile's diameter on existing metro tunnel displacement is analyzed. The results showthat,due to excavation of the foundation pit,the vertical displacement of the ultimate tunnel lining is about 4 mm and the horizontal displacement is about 1 mm. The numerical simulation results are in good agreement with the measured values. The maximum displacement of the tunnel lining is located at the bottom of the arch and the minimum value is located at the vault. The lining displacement tend to be down as a whole. The displacement of the tunnel lining side near the foundation pit is larger than that of the other side. The greater the diameter ofisolation pile is,the less the influence of the excavation of the foundation pit on existing metro tunnel is.
作者
曾晓鑫
丁文湘
彭玲
赵秀绍
徐长节
ZENG Xiaoxin DING Wenxiang PENG Ling ZHAO Xiushao XU Changjie(Jiangxi Key Laboratory of Infrastructure Safety Control in Geotechnical Engineering,East China Jiaotong University, Nanchang Jiangxi 330013, China Zhejiang Industrial Design Research Institute, Hangzhou Zhejiang 310052, China Research Center of Coastal and Urban Geoteehnieal Engineering,Zhejiang University, Hangzhou Zhejiang 310058,China)
出处
《铁道建筑》
北大核心
2017年第6期95-97,共3页
Railway Engineering
关键词
地铁隧道
基坑开挖
数值模似
隔离桩
位移
Metro tunnel
Foundation pit
Numerical simulation
Isolation pile
Displacement