期刊文献+

公共建筑设施管理成熟度模型构建 被引量:5

Facility Management Maturity Model for Public Buildings
下载PDF
导出
摘要 面向体量巨大、权属复杂、人流密集的公共建筑设施运营阶段专业知识缺乏,管理经验欠缺和测评体系缺失等问题,亟需引入现代设施管理知识体系,构建设施管理能力测评系统。比较分析现有典型成熟度模型,基于公共建筑设施管理特点,构建了公共建筑设施管理成熟度模型(FM3)基本结构,并分析确定其关键要素。为公共建筑设施管理能力测评和优化提供了理论模型。 Public buildings are getting huge and complicated, and the operations of these public buildings are characterized by lack of professional knowledge, management experience, and assessment system. Thus, modem facilities management knowledge and evaluation system should be introduced. In this paper, by comparing with existing typical maturity model, a facility management maturity model (FM3) for public buildings is constructed. After that, key elements of the FM3 are analyzed and confirmed. The research provides a theoretical model for the evaluation and optimization of public building facilities management capabilities.
作者 曹吉鸣 刘亮 缪莉莉 朱倩 CAO Ji-ming LIU Liang MIAO Li-li ZHU Qian(Institute of Facilities Management, Tongii University, Shanghai 200092, China School of Management, Shanghai University, Shanghai 200444, China)
出处 《工程管理学报》 2017年第2期59-63,共5页 Journal of Engineering Management
基金 国家自然科学基金青年科学基金项目(71602107) 上海市重点学科建设项目(B310)
关键词 公共建筑 设施管理 成熟度模型 public buildings facilities management maturity model
  • 相关文献

参考文献5

二级参考文献75

  • 1李亚红,郝克刚,葛玮.基于GQM模型的软件项目进度的度量过程[J].计算机应用,2005,25(6):1448-1450. 被引量:16
  • 2石双元,杨琴,单进.IT基础设施运营成熟度模型框架初步研究[J].管理学报,2006,3(1):60-63. 被引量:14
  • 3Earl M J. Evolving the E-business[ J]. Business Strategy Review, 2000,11(2) :33 -38.
  • 4Andersen Kim V, Henriksen Helle Z. E-government maturity models: extension of the layne and lee model[ J ]. Government Information Quarterly, 2006, 23 : 236 - 248.
  • 5Berg Pekka, Pihlajamaa Jussi, Poskela Jarno, et al. Benchmarking of quality and maturity of innovation activities in a networked environment [ J ]. International Journal of Technology Management, 2006,33 ( 2/3 ) : 255 - 278.
  • 6Thomson Kerry-Lynn, Solms Rossouw Von. Towards an information security competence maturity model[ J]. Computer Fraud & Security, 2006, 5:11 -15.
  • 7Jokela T, Siponen M, Hirasawa N, et al. A survey of usability capability maturity models: implications for practice and research[J]. Behaviour & Information Technology. 2006,25 (3) : 263 - 282.
  • 8Price M, Raghunathan S, Curran R. An integrated systems engineering approach to aircraft design [ J]. Progress in Aerospace Sciences, 2006, 42:331 -376.
  • 9Quayle Michael. Project management in european aerospace plc: a case study[ J]. Industrial Management and Data Systems, 1999, 5 : 221 - 226.
  • 10Kleiner Brian M, Drury Colin G, Palepu Prasad. A computer-based productivity and quality management system for cellular manufacturing [ J ]. Computers and Industrial Engineering, 1998, 34 (1) : 207 -217.

共引文献51

同被引文献22

引证文献5

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部