摘要
由中国十七冶集团冶金工程技术公司承建的扬州恒润三期高炉建设安装工程项目3~#高炉上料斜桥、下降管成功吊装完成,为高炉封顶目标提供了坚实的保证。论文通过工程实例,介绍了利用高炉进行斜桥吊装的施工工艺,以供参考。
The hosting of skip bridge and down pipe of 3^# blast furnace in the Yangzhou Hengrun No.3 blast furnace construction and installation engineering is successfully completed, this project is host by China MCC17 Group Metallurgical Engineering Technology Company, it has provided assurance for the capping of blast furnace. This paper through project example, introduces the construction technology of skew bridge hoisting using blast furnace, for reference.