AP1000核电机组凝结水精处理设计特点及调试经验反馈 被引量:1

Design and Commissioning of Condensate Polishing System of AP1000 Unit
下载PDF
导出
摘要 AP1000核电机组60 a的设计寿命对二回路水质提出了更高要求。为保证水质并提高系统固有安全性,海阳核电站凝结水精处理采用无阀旁路工艺,通过增加后置过滤器、改进再生设备、优化再生工艺来控制硫酸根的生成,防止蒸汽发生器不锈钢腐蚀;凝结水精处理系统调试时按照西屋分包模式进行,对调试过程中出现的一些情况进行了经验反馈。 The design life of AP1000 nuclear power plant is 60 years, it has higher requirements for the quality of secondary loop water. In order to ensure the water quality and enhance the inherent safety of the system, Haiyang nuclear power plant adopts valveless bypass to improve the safety of the condensate polishing system, and post filters are added, recycling facilities are improved, recycling process is optimized to control the generation of sulfate, and to prevent corrosion of stainless steel steam generator. The commissioning of Haiyang NPP adopted the Westinghouse Subcontracting mode, and some experiences feedback during the commissioning was noted.
出处 《中国核电》 2017年第2期194-199,共6页 China Nuclear Power
关键词 AP1000 凝结水精处理 设计 调试 经验反馈 AP1000 condensate polishing system design commissioning lessons learned
  • 相关文献

参考文献5

二级参考文献20

共引文献26

同被引文献27

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部