核电工程项目关键节点检查标准与方法研究

Study on Inspection Standards and Methods for Nuclear Power Engineering Project Key Milestones
下载PDF
导出
摘要 在调研中国核能电力股份有限公司(CNNP)开展的工程项目关键节点(装料及并网)检查现状的基础上,分析了当前CNNP开展的工程项目关键节点检查存在的不足,提出了核电工程项目关键节点检查标准及执行指南。 This article investigates the key milestone inspection of nuclear power engineering project which conducted by China National Nuclear Power Co., Ltd. (CNNP), analyzes main practices and problems based on key milestone inspection. Through extensive investigation and research, the key milestone inspection standards (including fuel loading and grid connection) and implementation guidelines of nuclear power engineering project are proposed. The conclusion is that standards and implementation guidelines for key milestone inspection of nuclear power engineering project can provide a reference for inspection of fuel loading and grid connection, so that enhance the effect of key milestone inspection.
作者 段锋 张珍
出处 《中国核电》 2017年第2期257-263,共7页 China Nuclear Power
关键词 核电工程项目 关键节点 检查标准 执行指南 nuclear power project key milestone inspection standard implementation guidelines
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部