期刊文献+

机组恢复问题的不确定规划方法

Uncertainty Programming Method for Airline Crew Scheduling Recovery
下载PDF
导出
摘要 对航空公司来说应急航班调度问题是最具挑战性的活动之一.机组配对是规划中十分重要的一环.一个以延误时间为不确定变量的机组恢复不确定规划模型,在机组规划被扰乱时,可以降低航空公司的成本.该模型的目标为最小化旅客失望率,同时将估计延误成本作为机会约束条件.运用不确定理论,将该模型转化为一个等价的确定性模型.并采用列生成算法解决该模型.该模型和算法有较强的实用性. Airline schedule development continues to remain one of the most challenging planning activities for any airline. A critical component of the schedule development activities is the appointment of crew. That expenses account for a large proportion in the total cost for airline. In order to reduce cost of airlines when disruption of crew scheduling happens, an uncertain programming model of crew recovery is constructed under uncertain condition with the delay minutes considered as uncertain variables. In the model, the objective is to minimize the expectation of the total weighted disappointment rate; moreover, the estimated delay costs are considered as chance constraints. The uncertain programming model can be transformed to an equivalent deterministic programming with uncertainty theory. To solve the model, a column generation algorithm is adopted. Finally, a numerical example is carried out to illustrate the efficiency of the pro posed model and algorithm.
作者 李宁 牟德一 LINing MOU De-yi(College of Sciences, Civil Aviation University of China, Tianjin 300300, Chin)
出处 《沧州师范学院学报》 2017年第2期10-13,23,共5页 Journal of Cangzhou Normal University
基金 中央高校基本科研业务费项目理学专项"应急调度问题的不确定规划方法" 编号:No.3122015L009
关键词 航空公司运营 机组恢复 不确定规划 列生成算法 Airline operations Crew recovery Uncertainty programming Column generation algorithm
  • 相关文献

参考文献1

二级参考文献9

  • 1接婧.国际学术界对鲁棒性的研究[J].系统工程学报,2005,20(2):153-159. 被引量:33
  • 2Diego Klabjan,Ellis L. Johnson,George L. Nemhauser,Eric Gelman,Srini Ramaswamy.Solving Large Airline Crew Scheduling Problems: Random Pairing Generation and Strong Branching[J]. Computational Optimization and Applications . 2001 (1)
  • 3Shebalov S,Klabjan D.Robust airline crew schedu-ling;move-up crews. Transportation Science . 2006
  • 4Tekiner H,,Birbil S I,Bulbul K.Robust crew pairingfor managing extra flights. Cmputers&OperationsResearch . 2009
  • 5Yen J W.A stochastic programming formulation of thestochastic crew scheduling problem. . 2001
  • 6Lan Shan,Clarke J P,Cynthia Barnhart.Planning forrobust airline operation:Optimizing aircraft routingsand flight departure times to achieve minimum passen-ger disruptios. Transportation Science . 2006
  • 7Yen J,Birge J.A stochastic programming approach to the airline crew scheduling problem. . 2000
  • 8Yan S,Tung T T,Tu Y P.Optimal construction of airline individual crew pairings. Computers and Operations Research . 2002
  • 9Andrew JSchaefer,Ellis L.Johnson,Anton J.Kleywegt,PGeorge,L.Nemhauser.Airline CrewScheduling UnderUncertainty. Transportation Science . 2005

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部