摘要
介绍新建某某客运专线沈家岭2号短小隧道利用双层小导管作为超前支护直接出洞,代替大管棚由出口反向进洞的施工技术,取得良好的经济效益。施工经验可供同类工程参考。
This paper introduces the technique of replacing the using big pipe shed to enter a tunnel reversely from the exit with the using of double-layer small pipes as pre-support to exit the tunnel directly in No.2 short tunnel of Shenjialing section of some newly-built passenger line, which brings good economic benefits. This construction experience can be referenced by similar projects.
出处
《石家庄铁路职业技术学院学报》
2017年第2期20-24,共5页
Journal of Shijiazhuang Institute of Railway Technology
关键词
隧道施工
双层小导管超前支护
大管棚施工
tunnel construction double-layer small pipes as pre-support construction with big pipe shed