刍议酒-湖特高压跨线施工期间水布垭电厂保供电措施 被引量:1

Power Supply Ensuring Measures for Shuibuya Hydropower Plant during the Over-crossing Construction of Jiuquan-Hunan UHV Transmission Line
下载PDF
导出
摘要 根据酒湖线特高压跨线施工对水布垭电厂运行造成的影响和要求,结合恩施地区及周边的电网结构、特点,电厂从组织管理、技术等多方面采取了种种措施,保证了厂网的安稳运行,并对进一步提升电厂的保供电能力提出了建议。 During the over-crossing construction of the Jiuquan-Hunan UHV transmission line through Shuibuya Hydropower Plant,effective measures are adopted to ensure the stable operation and power supply of the power plant considering the structures and characteristics of the power networks in Enshi District and neighboring regions. Recommendations are also made to further improve the power supply ability of the power plant.
作者 孙伟 SUN Wei(Hubei Qingjiang Hydroelectric Development Co., Ltd., Yichang 443000, Chin)
出处 《水电与新能源》 2017年第6期17-20,共4页 Hydropower and New Energy
关键词 水电厂 保供电 跨线施工 hydropower plant power supply ensuring over-crossing construction
  • 相关文献

参考文献4

二级参考文献9

共引文献16

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部