设备空闲时间段调整的设备驱动综合调度算法

Machine-Driven Integrated Scheduling Algorithm with Equipment' Idle Adjustment
下载PDF
导出
摘要 针对设备驱动的综合调度算法没有考虑工序的结束时间,以及其同设备加工的下一道不可调度工序的开始时间形成该设备的空闲时间段可缩短的调度优化问题,提出了设备空闲时间段调整的设备驱动综合调度算法.该算法为使空闲设备即将加工的不可调度工序提前加工,缩短了设备闲置等待时间,提出该不可调度工序的最短加工路径,通过优先加工该路径上工序,使其紧前工序尽早加工完成.实例验证该算法可以有效缩短设备空闲等待时间,提高设备利用率. To solve the problem that general integrated scheduling algorithm based on machinedriven ignored the idle time of the machine due to the time difference between the end time of the process and the start time of the non-schedulable process,a machine-driven integrated scheduling algorithm with equipment'idle adjustment was presented.In order to operate the nonschedulable process in advance and reduce the waiting time of equipment'idle,a shortest path for the non-scheduling process was developed,making the processes in the path be operated firstly and the precedence activities be completed as soon as possible.Results show that,the proposed algorithm can make waiting time shorten effectively and improve equipment utilization.
出处 《北京理工大学学报》 EI CAS CSCD 北大核心 2017年第5期532-536,共5页 Transactions of Beijing Institute of Technology
基金 国家自然科学基金资助项目(61370086) 黑龙江省自然科学基金资助项目(F201101) 黑龙江省教育厅科技项目(12531105) 黑龙江省博士后科研启动项目(LBH-Q13092) 全国高等学校计算机教育研究会(研究生创新)项目(ER2014018)
关键词 设备驱动 不可调度工序 空闲时间段 加工路径 综合调度 machine-driven non-schedulable process equipment' idle process path integrated scheduling
  • 相关文献

参考文献9

二级参考文献121

共引文献114

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部