期刊文献+

建设项目大中型事故阶段性管理支撑体系

Management Support System for Medium-Large Construction Accidents Based on Stage Model
下载PDF
导出
摘要 为有效地支撑建设项目大中型事故的预防与实时管理,从事故发展进程角度逆向分析各阶段所需要的支撑体系,构建了基于阶段性模型的建设项目大中型事故管理支撑体系。首先在回顾阶段性模型研究的基础上,给出了建设项目大中型事故管理支撑体系的内涵和构成;进而对管理框架中各子系统,包括预警、决策响应、过程保障、善后恢复等支撑体系进行研究。该管理框架从事故发展进程角度为政府部门、企业、项目各层次对建设项目大中型事故的实时管理与控制提供了理论支撑与操作建议。 Aiming at providing effective management support for medium - large sized construction accidents during their develop-ment process, this paper presented a comprehensive conceptual management support system for construction accidents based on Stage Model (MSCASM) from the perspective of accident development process. After review of previous constructed stage mod-els ,the meaning and content of the management system for medium - large sized construction accidents are presented and the de-tailed components, including the sub - system of pre - warning support system (PWSS) , decision response support system (DRSS) , process supply support system(PSSS) and rehabilitation support system (RHSS). The framework of MSCASM propo-ses a feasible ideology and practical method for real - time management of the construction accidents during the process, which is useful for different management level of government, enterprises and project.
出处 《武汉理工大学学报(信息与管理工程版)》 CAS 2017年第3期295-298,共4页 Journal of Wuhan University of Technology:Information & Management Engineering
基金 教育部人文社会科学研究青年基金项目(12YJC630242) 国家哲学社会科学基金项目(14BTQ026) 上海市教育委员会科研创新重点基金项目(13ZS130)
关键词 建设项目 大中型事故 阶段性模型 管理支撑体系 预警 决策响应 过程保障 善后恢复 construction project medium - large construction accidents stage model management support system pre -warning decision response process supply rehabilitation
  • 相关文献

参考文献8

二级参考文献85

共引文献299

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部