摘要
朔州市七里河片区综合管廊共建设了怡西路、怡东路、顺义路共7.6 km的综合管廊。结合其设计特点,详细介绍了该工程纳入管线、断面选择、平面布局、节点设计等方面的设计经验,可供相关专业人员参考。
The municipal utility tunnels are constructed in Yixi Road,Yidong Road and Shunyi Road in Qilihe Area of Shouzhou City,and the total length is 7.6 km.According to the design characteristics,the article introduces the design experience of intake pipeline,section selection,plane layout and node design of this project in detail,which can be referred for the similar projects.
出处
《城市道桥与防洪》
2017年第7期285-288,共4页
Urban Roads Bridges & Flood Control
关键词
综合管廊
断面设计
管线分支口
通风口
污水管
utility tunnel
section design
pipeline branch outlet
ventilation opening
sewage pipe