摘要
从需求与功能两方面详细介绍多方案网络计划,重点分析利用多方案网络计划实现矿建施工进度控制的具体措施及多方案网络计划的计算与应用方法,结合矿建施工的实际情况,促进施工进度控制在建设现场可以更顺利地开展,将工期控制在预期范围内。
This paper analyzed the muhi-scheme network plan in details from the aspects of demand and function, and mainly analyzed the specific measures of the control of the mine construction progress by multi-scheme network plan and the calculation and the application methods of multi-scheme network plan. Combined with the actual situation of the mine construction, this will be beneficial to promoting the smooth running of construction progress control in the construction field and controlling the time limit for a project within the expected range.
作者
杨海荣
YANG Hairong(Hongsha No.1 Construction Co., Ltd. of Shanxi, Yangquan 045000, Shanxi, China)
出处
《能源与节能》
2017年第7期26-27,共2页
Energy and Energy Conservation
关键词
多方案网络计划
矿建施工
进度控制
multi-scheme network plan
mine construction
progress control