期刊文献+

研究地铁工程施工中模糊层次分析法的安全评价

Safety Evaluation of Fuzzy Analytic Hierarchy Process in Subway Engineering Construction
下载PDF
导出
摘要 随着经济及科学技术的不断发展,城市地铁建设已经进入到高速发展阶段,而且因为轨道交通的建设周期比较长且地下施工难度大、地下结构复杂等多方面要素的影响,导致地铁工程项目在施工时经常会出现各种影响项目施工安全的要素。以当前地铁工程项目施工过程中模糊层次分析法发展情况为基础,结合近年来工作开展的情况,提出科学的安全评价方式。 With the continuous development of economy and science and technology, urban subway construction has entered the stage of high-speed development, and because the construction period of rail transit is long, the underground construction is difficult and the underground structure is complicated, in the construction of the project, there are various factors affecting the construction safety of the project. Based on the development of Fuzzy Analytic Hierarchy Process during the construction of the current subway project, this paper puts forward the scientific safety evaluation method according to the situation of the "work carried out in recent years.
出处 《价值工程》 2017年第23期29-30,共2页 Value Engineering
基金 项目名称:2016年辽宁省大学生创新创业训练计划项目(地铁工程施工安全评价研究) 项目编号:201613208041
关键词 地铁工程 施工 模糊层次分析 安全评价 subw-ay engineering construction Fuzzy Analytic Hierarchy Process safety evaluation
  • 相关文献

参考文献7

二级参考文献41

共引文献84

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部