浅析水电工程延期管理费补偿计算方法

Analysis of Calculation Method of Deferred Management Fee Compensation for Hydropower Project
下载PDF
导出
摘要 本文结合工程实际情况,充分分析工程合同边界条件,掌握工程实际资料,提出工程合同工期延误后管理费用补偿计算方法,并对各种补偿计算方法的优缺点进行对比分析。本文中的工期延期管理费用补偿计算方法,可以为类似工期索赔问题处理提供一定的参考性。 This paper combined with the actual situation of engineering project contract, fully analyzed the boundary conditions, mastered the engineering data, proposed the calculation method of project contract delay compensation management fee, as well as compared and analyzed advantages and disadvantages of various compensation calculation methods. The calculation method in this paper can provide reference for dealing with similar claim for extension of time.
出处 《价值工程》 2017年第24期20-21,共2页 Value Engineering
关键词 工程延期 管理费 补偿 方法 project delay management fee compensation method
  • 相关文献

参考文献4

二级参考文献9

  • 1臧军昌 国际咨询工程师联合会.土木工程施工合同条件应用指南[M].北京航空工业出版社,1992..
  • 2Roger Gibson.工期索赔[M].崔军,译.北京:机械工业出版社,2011.
  • 3Society of construction law. Society of construction law: delay and disruption protocol [ M ] . Wantage: The Society of Construction Law, Administrative Office, 2002.
  • 4张永波、吕文学.工期延误与干扰索赔分析准则[M].北京:北京交通大学出版社,2012.
  • 5Keith Pickavance. Delay and disruption in construction contracts [ M] . 4thed. London: Sweet & Maxwell, 2010.
  • 6Stephen Furst, The Hon Sir Vivian Ramsey. Keating on construction contracts [ M ]. 9th ed. London: Sweet & Maxwell, 2012.
  • 7Chow Kok Fong. Law and practice of construction contracts [ M ]. 4th ed. Singapore: Sweet & Maxwell, 2012.
  • 8付兴友.对大岗山水电工程前期工作若干问题的思考[J].人民长江,2011,42(14):5-7. 被引量:4
  • 9陈希斌,周青海.以优秀企业文化促进大岗山工程建设[J].人民长江,2011,42(14):16-19. 被引量:1

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部