无额外支洞布置条件下大断面洞室开挖施工方案

Construction plan of large cross section cavern excavation under the condition without additional branch hole layout
下载PDF
导出
摘要 千岛湖配水工程分水江左右岸地下检修阀室断面为窄高的城门洞形,且纵向长度较短,没有条件布置额外的施工支洞分层开挖。本文介绍的开挖施工方案,有效解决了现场问题,安全、高质量地完成了检修阀室的开挖支护,节约了直线工期。 The underground service valve chest cross section on the left and right bank of Fenshui River in Qiandaohu Water Distribution Project is narrow and high city-gate rorm. Its longitudinal length is shorter. There are no conditions to arrange additional construction branch holes for stratified excavation. The construction excavation plan introduced in the paper can effectively solve the problems in the site. Excavation support of service valve chests can be finished safely with high quality, thereby saving straight line construction duration.
作者 叶雷震 房敦敏 YE Leizhen FANG Dunmin(Hangzhou Rural Water Conservancy Management Station, Hangzhou 310016, China Huadong Engineering Corporation Limited , Hangzhou 310014, China)
出处 《水利建设与管理》 2017年第5期8-11,15,共5页 Water Conservancy Construction and Management
关键词 地下检修阀室 导洞 分层开挖 underground service valve chest pilot tunnel stratified excavation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部