8Huang T, Kong C W, Guo H L, Baldwin A, Li H. A virtual prototyping system for simulating construction processes [J]. Automation in Construction, 2007, 16( 5 ): 576-585.
9Li H, Huang T, Kong C W, Guo H L, Baldwin A, Chan N, Wong J. Integrating design and construction through virttial prototyping[J]. Automation in Construction, 2008, 17 ( 8): 915-922.
10Li H, GUO H L, Skibniewski M J, Skitmore M. Using the IKEA model and Virtual Prototyping technology to improve construction process management[J]. Construction Management and Economics, 2008, 26 ( 9 ): 991-1000.