3CIGRE W G. 36. 04 Guide on EMC in power plants and substa- tions[S], 1997.
4He J L, Gong X H. Discussion on electromagnetic compatibility index for secondary system of substation[C]//International Symposium on Electromagnetic Compatibility, 2007(EMC 2007). [S.l.]: IEEE, 2007: 202-205.
5Bajramovic Z, Turkovic I, Mujezinovic A, et al. Overvoltages in secondary circuits of air-insulated substation due to disconnector switching[C]//2012 IEEE International Conference on Power System Technology. Auckland, New Zealand: IEEE, 2012: 1-4.
6Wiggins C M, Thomas D E, Nickel F S, et al. Transient electromag- netic interference in substations[J]. IEEE Transactions on Power Delivery, 1994, 9(4): 1869-1884.
7Russell B D, Harvey S M, Nisssol S L. Substation electromagnetic interference: part 2 susceptibility testing and EMI simulation in high voltage laboratories[J]. IEEE Transactions on Power Apparatus and Systems, 1984, 103(7): 1871-1879.
8Heib W A, Kassel E, Schwarz H, et al. Electromagnetic shielding in 123/24 kV substation in urban[C]//International Power Supply Con- ference. [S.I.]: [s.n.], 1999: 122-125.
9Pertorus P H, Britten A C. Radiated transient measurements with substation operation[R]. Pads, France: CIGRE, 1996: 49-53.
10Barrack C S, Siew W H, Pryor B M. A review of transient electro- magnetic interference measurement method[R]. Pads, France: CIGRE, 1996: 41-48.