摘要
对灾后重建进行了概述,基于业主的角度,从资金管理、进度管理、质量管理三方面,对灾后重建项目管理问题进行了分析,并剖析其形成原因,从而提出了相对应的解决对策,为同类工程提供参考。
This paper summarized the disaster reconstruction, based on the owner9 s point of view, from the fund management, schedule man-agement ,quality management three aspects, analyzed the management problems of disaster reconstruction project, and analyzed its forming cau-ses ,and put forward corresponding countermeasures, provided reference for similar engineering.
出处
《山西建筑》
2017年第17期220-222,共3页
Shanxi Architecture
关键词
灾后重建
地震
融资渠道
救灾资金
disaster reconstruction, earthquake, financing channel, disaster relief fund