4Gary L Ockwell.Implimentation of network reconfiguration for TAIWAN power company[C]//Power Engineering Society Genearl Meeting, 2003,IEEE Volum 4,2003.[s.l.]:[s.n.]:2434.
5Kume S,Rizzi A A.A high-performance network infrastructure and protocols for distributed automation[C]// Robotics end Automation,2001,Proceedings 2001 ICRA. IEEE International Conference on Volume 3,2001. [s.l.]:[s.n.]:3121-3126.
6Matsumoto Y,Oohashi T,Matsuura Y.The concept of distribution automation system in the kansai elecric power co[C]//Power Engineering Society 1999 Winter Meeting,IEEE Volume 2,1999.[s.l.]:[s.n.]:850-853 vol.2.
7Fujisawa A,Kurokawa N.Oversea distribution automation system based on japanese experience[C]// Transmission and Distribution Conference and Exhibition 2002:Asia Pacific.IEEE/PES,Volume:2,2002. [s.l.]:[s.n.]:1164-1169 vol. 2.