3Tukel O I. An investigation of buffer sizing techniques in critical chain schedule[J].Europe Journal of Operational Research, 2006, 172 (2).
4GoldrattEM.关键链[M].北京:电子工业出版社,2009.
5Boukendour S. Estimating software cost contingency using options theory[C]. Proceedings of the International Conference on Information Technology: Coding and Computing, 2005.
6Evangelin G D, Suresh K V, Rajani K K. Predicting the soRware performance during feasibility study[J].Sottware lET, 2011, 5 (2).