摘要
某市政工程地处长江一级阶地地貌单元,分布着深厚的软弱土层。该工程既有地基处理也有基坑支护。如果地基处理和基坑支护单独进行设计,则工期长、造价高。而采用格构式水泥搅拌桩进行地基处理兼做基坑被动区加固设计,在技术、经济和工期上均具有很大优势。实践证明该设计达到了预期功能及目的,可供类似工程借鉴。
The subsurface condition of a municipal engineering project consists of thick soft cohesive soil of the fir Yangtze River. Both the deep excavation and the soil improvements are required for the project. A high construct extended construction period were expected if the soil improvement and the deep excavation supporting system w and constructed separately. Using the grid formed soil-cement mixing columns as the soil improvemenl and the stre the passive zone of the excavation supporting zone bas the advantages in both cost and "the construction schedule.
出处
《土工基础》
2017年第3期256-258,268,共4页
Soil Engineering and Foundation
关键词
格构式水泥搅拌桩
地基处理
基坑被动区加固
(}rid Formed Soil-Cement Mixing Columns
Soil Improvement
Strengthening of the Passive Zone of t cavation Supporting System st terrace of ion cost and ere designed ngthening of he Deep Ex