4Friedrich E. Life-cycle assessment as an environmentalmanagement tool in the production of potable water [ J ]. Water Sci Techno1,2002,46(9) :29 -36.
5Carpentieri M, Corti A, Lombardi L. Life cycle assess- ment (LCA) of an integrated biomass gasification com- bined cycle (IBGCC) with C02 removal[J]. Ener Con- vers Manage ,2005,46 ( 11/12 ) : 1790 - 1808.
6Spitzley D V, Grande D E, Keoleian G A,et al. Life cy- cle optimization of ownership costs and emissions reduc- tion in US vehicle retirement decisions [ J ]. Transport Res Part D : Transport Environ,2005,10 (2): 161 - 175.
7Richard Brindley.'An Overview of the RIBA Appointment Agreements'. http://www.architecture.com/ . 2011
8American Institute of Archi-tects.'AIA DOCUMENT A201—1997:General Conditions of the Contract for Construction'. http://www.aia.org/ . 1997