摘要
隧洞开挖过程中围岩塌方是常发生的事情,塌方后如何迅速妥善处理,保证后续安全施工十分关键。本文详细论述了大伙房水库输水工程10号主洞开挖过程中出现了大断面塌腔情况,对塌腔原因进行了分析,论述了塌腔处理详细措施,为类似工程提供了宝贵经验。
The surrounding rock collapse is often happen in the process of the tunnel excavation,how to quickly and properly handle the collapse to ensure the follow-up safe construction is key.The paper elaborates the large cross section collapse cavity situation in the excavation process of the main tunnel 10# for the Dahuofang reservoir water conveyance project,analyzes the causes of collapse and discusses the detailed treatment measures for the collapse cavity,which could provide the references for similar projects.
出处
《东北水利水电》
2017年第7期34-35,45,共3页
Water Resources & Hydropower of Northeast China
关键词
隧洞
塌腔
处理措施
大伙房水库输水工程
tunnel
collapse cavity
treatment measure
Dahuofang reservoir water conveyance project