京张高铁引入北京枢纽过渡工程方案 被引量:3

Research on the Transition Project Plan of Beijing-Zhangjiakou High Speed Railway Leaded in Beijing Terminal
下载PDF
导出
摘要 新建高铁引入既有铁路枢纽在工程建设过程中,势必会对既有铁路枢纽的运营产生一定影响,本着"铁路建设是为了更好地服务铁路运营,铁路运营为铁路建设创造适时便利的施工条件"这一互惠互利共赢原则,应采取过渡工程方案和运输调整措施减少铁路建设过程中对既有铁路枢纽运营的影响,同时为铁路工程的安全建设创造良好的外部环境。以京张高铁引入北京枢纽过渡工程方案为例,为类似高铁建设引入既有铁路枢纽过渡工程实施提供参考。 In the process of leading new built high speed railway in the existing railway terminal, there must be some infl uences to the operation of the existing railway terminal. In order to achieve the mutual benefit principle which is "railway construction providing good service for railway operation and railway operation supporting the railway construction", the transition project and transportation adjustment measures shall be adopted for lessening the infl uences to the existing railway terminal in railway construction. Moreover, the transition project would create favorable external environment. This paper takes Beijing-Zhangjiakou high speed railway leaded in Beijing terminal as an example, providing the references for leading high speed railway construction in existing railway terminal transition project construction.
作者 宁灿程
出处 《中国铁路》 2017年第5期60-66,共7页 China Railway
关键词 京张高铁 铁路枢纽 过渡工程 方案研究 Beijing-Zhangjiakou high speed railway railway terminal transition project plan research
  • 相关文献

参考文献1

二级参考文献5

  • 1耿志修.大秦铁路重载运输技术[M]{H}北京:中国铁道出版社,2009.
  • 2杨浩;何世伟.铁路运输组织学[M]{H}北京:中国铁道出版社,2001.
  • 3刘其斌;马桂贞.铁路车站及枢纽[M]{H}北京:中国铁道出版社,2010.
  • 4朔黄铁路发展有限责任公司.朔黄铁路公司2013年列车基本运行图资料[Z],2013.
  • 5张铸.提高中间站作业效率的对策[J].铁道货运,2012,30(1):53-54. 被引量:4

共引文献2

同被引文献11

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部