期刊文献+

基于直线段特征单元提取的隧道砼衬砌接缝去除算法

Lining Seam Elimination Algorithm in Tunnel Concrete Lining Based on Line Feature Unit Extraction
下载PDF
导出
摘要 由于部分隧道砼衬砌表面图像中固有衬砌接缝与裂缝灰度值相似且线性一致,衬砌接缝处易产生起砂、空鼓、掉块及渗漏水,已有的裂缝检测算法提取单一的裂缝存在缺陷。提出基于直线段特征单元提取的隧道砼衬砌表面衬砌接缝去除算法。在裂缝聚类特征粗检测的基础上,首先通过改进的累计概率霍夫变换检测出显著的直线特征;然后利用像素点的延伸搜索计算来提取衬砌接缝可处理的最小直线段特征单元线;最后根据单元线标记信息及定区域内单元线特征去除部分衬砌接缝,并运用渗流去噪算法得到隧道砼衬砌表面真实裂缝。实验结果表明,提出的算法弥补了已有隧道砼衬砌表面裂缝检测技术的不足,能够精确、快速、有效地去除相似线性特征对单一的真实裂缝检测的干扰,具有较强的鲁棒性。 Due to the brightness similarity and linear consistency between surface cracks and inherent lining seams in some tunnel concrete lining,lining seams are prone to sugaring,hollowing,localized rock fall and water leakage.The existing crack detection algorithms cannot accurately extract single cracks.This paper proposed a lining seam elimination algorithm based on the extraction of line feature unit in tunnel concrete lining.Firstly,on the basis of the clustering characteristics detection which is similar to cracks,the significant linear characteristics have been detected by progressive probabilistic hough ransform(PPHT).Secondly,the minimum line feature processing unit of lining seam,which is called Unit-Line,has been extracted by the search calculation of pixel extension.Finally,according to the marking information of the Unit-Line characteristics and the Unit-Line characteristics in fixed area,apart of the lining seams can be removed,and the real surface cracks in tunnel concrete lining can be obtained by the percolation de-noising.The experimental results show that the proposed surface lining seam elimination algorithm based on the extraction of line feature unit,which has strong robustness,fills the gap in the existing technology of tunnel concrete lining surface cracks detection,and the interference of similar linear characteristics to the single real cracks detection can be removed accurately,quickly and effectively.
出处 《计算机科学》 CSCD 北大核心 2017年第7期304-308,共5页 Computer Science
基金 重庆市科委基础科学与前沿技术研究重点项目(cstc2015jcyjBX0090)资助
关键词 衬砌接缝去除 累计概率霍夫变换 单元线 渗流去噪 裂缝检测 Lining seam elimination PPHT Unit-Line Percolation de-noising Crack detection
  • 相关文献

参考文献6

二级参考文献51

  • 1WANG ZhengZheng,GAO Bo,JIANG YuanJun,YUAN Song.Investigation and assessment on mountain tunnels and geotechnical damage after the Wenchuan earthquake[J].Science China(Technological Sciences),2009,52(2):546-558. 被引量:87
  • 2田铮,李小斌,句彦伟.谱聚类的扰动分析[J].中国科学(E辑),2007,37(4):527-543. 被引量:33
  • 3BHANDARKAR S M,LUO Xing-zhi,DANIELS R,et al Detection ofcracks in computer tomography images of logs[ J]. Pattern Recogni-tion Letters,2005,26(14) :2282-2294.
  • 4TEOMETE E, AMIN V R,CEYLAN H. Digital image processing forpavement distress analyses [ C]//Proc of Mid-Continent Transporta-tion Research Symposium. 2005:1-13.
  • 5IKHLAS A Q,ABUDAYYEH 0,KELLY M E. Analysis of edge-detec-tion techniques for crack identification in bridges [ J]. Journal ofComputing in Civil Engineer,2003,17(4) :255-263.
  • 6张宏,董安国,徐志刚,等.种子游走算法及其在桥梁裂缝检测中的应用[C]//第三届IEEE电々电子.与智能交通系统国际学术会议论文集.2010:270-274.
  • 7敗剑宏,吴升亚.图论及其算法[M].合肥:中国科学技术大学出版社,2005 :26-28.
  • 8SUBIRATS P,DUMOULIN J,LEGEAY V, et al. Automation of pave-ment surface crack detection using the continuous wavelet transform[C]//Proc of IEEE International Conference on Image Processing.2006:3037-3040.
  • 9ROSALES M B, FILIPICH C P, BUEZAS F S. Crack detection inbeam-like structures[ J]. Engineering Structures,2009,31 (10):2257-2264.
  • 10YAMAGUCHI T, NAKAMURA S, SAEGUSA R,e( al. Image-basedcrack detection for real concrete surfaces[ J]. IEEJ Trans on 曰ectri-cal and 日ectronic Engineering,2008,3(1) :128-135.

共引文献95

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部