摘要 某铁矿磨矿工艺通过引进立式螺旋搅拌磨机,将原三段"阶段磨矿、阶段选别"工艺流程改造成二段"阶段磨矿、阶段选别"工艺流程,经过一年的实际运行结果表明:采用两段磨矿,产品细度亦可达到要求(-0.045 mm占90%以上);与技改前相比,运行成本每年可节省668万元,降低了47%。本次技改成果可在类似工艺中推广,为企业降本增效。 After introducing the vertical spiral stirring mill, the grinding process in an iron mine was transformed to two-stage flow of stage grinding and stage separation from original three-stage flow of stage grinding and stage separation. Actual operation results for one year showed: the fineness of the product of the two-stage flow reached the requirement(-325 mesh accounted for more than 90%); compared with the operation cost before technical innovation, the operation cost saved 6.68 million RMB per year, which reduced by 47%. The results of the technical innovation could be spread to similar process flow so as to reduce the cost and enhance the benefits of the enterprise.
作者 孙良全 SUN Liangquan(Xinjiang Tianhua Mining Co., Ltd., Nilka 835700, Xinjiang, Chin)
出处 《矿山机械》 2017年第7期44-46,共3页 Mining & Processing Equipment
关键词 立磨机 球磨机 技改 降本增效 vertical mill ball mill technical innovation cost reduction and benefit enhancement
  • 相关文献

参考文献2

二级参考文献7

共引文献25

同被引文献15

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部