摘要
海洋平台工艺中,管线系统试压工作是一道至关重要的工序,就此探讨了管线系统压力试验前期准备工作,研究了管线系统压力试验步骤和方法。
In the offshore platform process, the pressure test of the pipeline system has been a critical process. In this paper, the preliminary preparation of pressure test for pipeline system is discussed, and the pressure test steps and methods of pipeline system are studied.
作者
王玉伟
Wang Yuwei(Offshore Oil Engineering Corp, Tianjin 30045)
出处
《现代工业经济和信息化》
2017年第12期91-92,共2页
Modern Industrial Economy and Informationization
关键词
海洋平台
工艺管线系统
压力试验
offshore platform
process piping system
pressure test