摘要 试桩未加载到破坏荷载时 ,根据已有试桩实测荷载沉降数据 ,用P -S曲线延伸法与双曲线法可预测出桩的极限荷载。尤其是P -S曲线延伸法适应性较好。只要结合桩的P -S曲线形态统一考虑 ,必要时进行综合判定 ,预测结果是可靠有效的。 When the fracture load was not reached for a trial pile, the ultimate load of the pile might be predicted according to the field-surveyed load settlement data of existing trial piles and by P-S curve extension method and hyperbola method, among which, the P-S curve extension method had better adaptability. Provided united consideration in combination with the P-S curve of a pile and necessary comprehensive judgement were conducted, the prediction result would be reliable and effective. That would be of great significance for economical, rational and safe application of pile foundation.
出处 《水运工程》 北大核心 2002年第9期5-8,共4页 Port & Waterway Engineering
关键词 极限承载力 预测 双曲线法 P-S曲线延伸法 桩基工程 港口工程 ultimate bearing capacity prediction hyperbola method P-S curve extension method
  • 相关文献

参考文献1

  • 1刘金励.桩基工程技术.(徐顺兴)桩在垂直荷载作用下的变化规律[J].北京:中国建材工业出版社,1996,(8):8-11.

同被引文献95

引证文献17

二级引证文献64

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部