以工业工程的作业测定和方法研究为基础,用生产线平衡技术对排污泵转子装配生产线进行改善.通过制作工作流程动作时间观测表和山积图,确定改善方向;综合运用作业ECRS原则、动作分析和作业分析构建改善方案;对作业工位进行合并重组,采用U型布局的生产线,实现减少操作人员数量及提高生产线空间利用率的目的.
In this paper, the production line balance technology of industrial engineering operation measurement and method research is used to improve the production line of rotor pump rotor assembly. Through the creation of work flow action time observation table and mountain plot table, the direction of improvement is determined; Combining the operational ECRS principles and the combination of action analysis and job analysis, the improvement plan is constructed; Work stations are reorganized and using U-shaped layout for production line to achieve reduction of operating personnel and improve the space utilization of production line.
作者
宗方芳
ZONG Fang-fang(School of Mechanical and Power Engineering,Tongji University, Shanghai 200092, China Shanghai Electric SHMP Pulverizing & Special Equipment Co., Ltd, Shanghai 200245,China)
出处
《成组技术与生产现代化》
2017年第2期12-17,共6页
Group Technology & Production Modernization
关键词
工业工程
生产线平衡
转子装配线
生产线改善
industrial engineering
line balance
the rotor assembly line
improve of the line