中铝华润吕梁电解铝工程厂区位于山区,为了保证工程区建筑物的防洪安全,需采取防洪工程措施。文章主要介绍了赤泥堆场区的防洪工程布置,分别从泄洪方案比选及结构设计计算入手,选择了合理的工程布置方案,为山地厂区的防洪工程设计提供借鉴依据。
Plant area of Chinalco China Resources Ltiliang electrolytic aluminium project is located in mountains. Flood control engineering measures should be adopted in order to ensure flood control safety of buildings in the project area. In the paper, flood control engineering layout of Chinidui Yard is introduced mainly. Rational engineering layout plan is selected from the aspects of flood discharge plan comparison and structure design calculation respectively. Reference basis is provided for flood control project design of plant areas in mountainous area.
出处
《水资源开发与管理》
2017年第3期68-70,76,共4页
Water Resources Development and Management
关键词
防洪工程
泄洪方案比选
结构设计计算
flood control engineering
flood plan comparison
structure design and calculation