新密市泽河从未进行系统治理,村庄及企业挤占河道现象日益严重,行洪断面逐渐缩窄,防汛形势非常严峻。本文针对山洪沟存在的问题,通过论证分析提出具体的工程措施,以提高山洪沟的防洪标准,扩大行洪能力,保障沿岸村庄及企业生产生活安全。
Xinmi Zehe River is not governed systematically. Villages and enterprises squeeze rivers more anti more seriously. The flood discharge section is gradually narrowed, and the flood control situation is very serious. In the paper, concrete engineering measures are proposed through discussion and analysis aiming at problems of flasil flood ditchers, so that the flood prevention standards of mountain torrent ditch are improved, the flood discharge capacity is expanded, and the production and living safety of villages and enterprises along the river are guaranteed.