摘要
介绍了市政排水管道工程施工前期的准备工作,从沟槽开挖、管道主体施工、检查井、闭水试验、回填五方面,探讨了管道施工中的质量控制要点,并对施工后期恢复路面进行了分析,有助于提升施工质量。
The thesis introduces preliminary construction preparations of municipal drainage pipeline engineering, explores pipeline construction quality control points from five aspects of ditch excavation, major pipeline construction, inspection shaft, water-closing test and backfill, and ana-lyzes post construction recovery pavement, which will be good for improving construction quality.
出处
《山西建筑》
2017年第18期124-125,共2页
Shanxi Architecture
关键词
排水管道
施工质量
管材
检查井
drainage pipeline, construction quality, pipe material, inspection shaft