摘要 在原600 MW级水氢氢汽轮发电机的基础上,以系列化和模块化为设计原则,通过对定子机座和铁心的结构改进及优化,实现机座和铁心的平行作业,缩短整机制造周期,降低生产成本,增强产品市场竞争力。 Based upon the original 600 MW class wa- ter-hydrogen-hydrogen turbine generator, improvement and optimization of the starer frame and iron core were done following the design principle of seriation and modulariza- tion, thus, realizing the run-in manufacture of frames and iron cores, decreasing manufacturing period of the complete set, reducing productive cost and strengthening the market competitiveness of the products.
作者 邵祖鹏
出处 《电机技术》 2017年第3期7-8,14,共3页 Electrical Machinery Technology
关键词 600 MW级发电机 结构改进 平行作业 定子结构 600 MW class turbine generator con-structional improvement run-in manufacture stator con-struction