期刊文献+

济南市顺河高架系杆拱桥吊杆更换设计 被引量:4

Suspender Replacement Design of Jinan Shunhe Viaduct Tied-arch Bridge
下载PDF
导出
摘要 济南市顺河高架系杆拱桥跨越多股电气化铁路干线,跨径组成为1—90 m下承式钢管混凝土柔性系杆刚架拱桥,介绍该桥的吊杆更换设计。从3个方面介绍中小跨径系杆拱桥吊杆更换的设计思路:新吊杆结构型式选取、临时吊杆体系对比、电气化铁路上方更换吊杆施工注意事项。对施工监控、钢管混凝土脱粘、系杆松弛进行简单说明。模拟试验结果验证了该吊杆更换方法是可行的。 Jinan Shunhe Viaduct tied-arch bridge crossing over the electrified railway trunk of multiple track lines is a concrete-filled steel tubular( CFST) tied rigid frame through arch bridge with a net span of 90 m. This paper introduces the suspender replacement of the bridge and addresses the design of tied-arch bridge suspender replacement with small-span or medium-span from the following three aspects:the selection of the new suspender structure type,the comparison of the temporary suspender system,and the construction considerations in suspender replacement over electrified railway. It explains briefly construction control,deboning between steel tube and concrete,and relaxation of the tie bar. The simulation test results demonstrate that the method of the suspender replacement is feasible.
作者 张武
出处 《铁道标准设计》 北大核心 2017年第8期74-78,83,共6页 Railway Standard Design
基金 中铁工程设计咨询集团有限公司科研项目(研2012-20)
关键词 下承式刚架系杆拱 吊杆更换 跨电气化铁路 设计 施工监控 模拟试验 Rigid-frame tied through arch Suspender replacement crossing over electrified railway Design Construction control Simulation test
  • 相关文献

参考文献7

二级参考文献35

共引文献32

同被引文献24

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部