摘要
以某水泥厂废气处理立磨机基础大体积混凝土的施工为主线,从原材料及配合比控制、混凝土供应及施工工艺、混凝土养护及温控措施三方面,提出了施工过程中的主要控制事项,确保大体积混凝土的施工质量达到设计要求。
Taking mass concrete construction of the cement plant waste gas processing vertical mill machine as the principal line, starting from three aspects of raw material mixing proportion control, concrete supply and construction technology, concrete maintenance and temperature con-trol measures, the paper puts forward major construction control matters, so as to guarantee mass concrete construction quality meeting design de-mands.
出处
《山西建筑》
2017年第19期103-105,共3页
Shanxi Architecture
关键词
大体积混凝土
水泥
粗骨料
掺合料
mass concrete, cement, coarse aggregate, admixture