隔河岩电厂同步相量测量装置PMU改造 被引量:2

Renovation of the Phasor Measurement Unit in Geheyan Hydropower Plant
下载PDF
导出
摘要 根据隔河岩水电厂同步相量测量装置(PMU)改造的相关背景及设计思路,以及PMU改造后的系统结构、基本功能及计算方法,分析了其存在的优点及不足。新PMU系统的投运,规范了发电机组及其控制系统的监测,在促进电网运行动态监视与提高电力系统运行可观测性方面发挥了重要作用。 The renovation of the phasor measurement unit(PMU) in Geheyan Hydropower Plant is introduced,including the renovation background,design ideas,system structure,main functions and calculation methods after the renovation.Advantages and disadvantages of the system are analyzed.It shows that the operation of the renovated PMU system not only standardizes the monitoring of the generator units and the control system,but also promotes the dynamic monitoring of the power grid and improves the operational observability of the power system.
作者 匡蕾 黄然 KUANG Lei HUANG Ran(Hubei Qingjiang Geheyan Hydropower Plant, Changyang 443503, Chin)
出处 《水电与新能源》 2017年第7期29-35,共7页 Hydropower and New Energy
关键词 同步相量测量 双主模式 数据通道 对时脉冲信号 phasor measurement dual master mode data channel time synchronizing pulse signal
  • 相关文献

参考文献3

二级参考文献29

共引文献69

同被引文献5

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部