高校基本建设前期工作的重要环节及对策研究

Research on important procedures and countermeasures to basic construction work in colleges and universities
下载PDF
导出
摘要 文章对高校基本建设的前期工作进行了总结,并对其过程进行分析。其主线就是:立项批文—规划审批—招标投标—施工许可—质检申报。因政策更新等原因,看似简单的前期工作变得漫长且艰难。建设单位可以通过"熟悉政策、了解程序、抓住主线、多项并进、掌握关系、尽量超前、灵活细心、解决问题"的思路进行前期工作,以尽量减少不必要的反复。 This paper summarizes the preliminary work of the basic construction of colleges and universities, and analyzes the process. The main line is: project approval, planning approval, bidding, construction permits, quality inspection report. Due to the policy updates and other reasons, the seemingly-simple preliminary work has become long and difficult. The construction unit can use the idea "be familiar with the policy, understand the program, grasp the main line, carry out muhinomial procedures, grasp the relationship, advance, be flexible and careful, solve the problem" to do the preparatory work, and minimize the unnecessary repeatition.
作者 王友荣
出处 《江苏科技信息》 2017年第20期36-38,共3页 Jiangsu Science and Technology Information
关键词 高校 基本建设 前期工作 colleges and universities, basic construction, preliminary work
  • 相关文献

参考文献1

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部