摘要
资源型、工程型、水质型缺水已成为制约隆德县发展的瓶颈。针对近年来隆德县降水量偏少、无有效降水、旱情日趋严重、城乡居民供水严重不足的突出问题,提出通过境内跨流域调水、客水调入、加快现有工程建设改造力度等工程措施,从根本上解决隆德县长期缺水的困境。
Resource-based, engineering and water-quality water shortage are the bottlenecks of developing Longde County. Long-term water shortage problems in Longde County are fundamentally solved through the following engineering measures, namely domestic inter-basin water transfer, foreign water diversion, acceleration of construction and transformation efforts in existing projects, etc. aiming at the prominent problems in recent years, less rainfall in the whole county, no effective rainfall, more and more serious drought as well as seriously insufficient water supply of town and rural citizens.
出处
《水资源开发与管理》
2017年第7期50-52,共3页
Water Resources Development and Management
关键词
旱情分析
发展对策
隆德县
drought analysis
development countermeasures
Longde County